
Energy and utilities
Made for the people who keep the lights on.
Safety glasses and on-site AI for plants, lines and pipelines, designed for weak signal.
On site
From the plant to the far end of the line.
Power, oil and gas, and water crews.
- Fit
- Designed to work with hard hats and hearing protection.
- Signal
- Built for weak signal
- Offline
- Keeps tracking, then syncs

Workflows
Four ways to start.
Designed for permits, isolations, contractor crews and remote sites.
Isolation checks
Each lock and tag verified against the permit.
Permit to work
Conditions checked in context before the job starts.
Contractor oversight
The same procedure, the same proof, every crew.
Maintenance rounds
Asset context and signed readings, on the record.
Remote sites
Works when the signal drops.
Built for plants, lines and pipelines far from a good signal.

- On site
- The AI runs on a machine at your site.
- Offline
- Tracking is designed to continue, then sync.
- Cloud
- Off unless you allow it.
Proof
Every lock, on the record.
Each isolation checked against the permit, then signed. The AI note is marked as AI.
For insurers and risk teams| # | Step | Time | Rule | Status |
|---|---|---|---|---|
| 01 | Notify the affected crewLOTO · 1910.147(c)(9) · 07:31 | 07:31 | LOTO · 1910.147(c)(9) | ✓ Verified |
| 02 | Shut down pump P‑201LOTO · 1910.147(d)(2) · 07:33 | 07:33 | LOTO · 1910.147(d)(2) | ✓ Verified |
| 03 | Close isolation valve V‑12LOTO · 1910.147(d)(3) · 07:36 | 07:36 | LOTO · 1910.147(d)(3) | ✓ Verified |
| 04 | Apply lock and tagLOTO · 1910.147(d)(4) · 07:38 | 07:38 | LOTO · 1910.147(d)(4) | ✓ Verified |
| 05 | Try start: zero energyStart attempt not in viewLOTO · 1910.147(d)(6) · 07:40 | 07:40 | LOTO · 1910.147(d)(6) | Needs review |
| 06 | Sign the permitPermit PTW-0419 · 07:44 | 07:44 | Permit PTW-0419 | ✓ Verified |
Questions
Straight answers.
Does it fit with a hard hat and earmuffs?
It is designed to work with common hard hats, hearing protection and the other gear your crews already wear. We fit each crew member at the start of the pilot.
Where is the safety eyewear certification?
The certification process has started and is in progress. We share its status and dates in your pilot briefing.
How long does the battery last?
We set the battery plan from your real shift and charging pattern before the pilot starts, and report how it held up.
Does it work with our safety and maintenance software?
PIN is built to feed the systems you already use, not replace them. We map the connection with you before the pilot.
Who sees the footage, and can it be used for discipline?
Access is by role, and sensitive access is logged. Workers can add their side, AI notes are marked as AI, and people, not AI, make decisions about people.
One site. Measured with you.
One crew, one workflow, 90 days, against your own baseline.